Inspection and Precautions for the Use of Integrated Drilling and Piling Machines.

Integrated Drilling and Piling Machine for Steel Sheet Piling

 

The integrated drilling and piling machine is a type of pressure machine for road guardrails, livestock fences, and other steel sheet piling applications. This equipment uses a diesel engine as its driving force and features full hydraulic drill machine gear transmission. It is characterized by being lightweight for transport, high precision in basic piling, durability, and environmental friendliness.

 

Inspection Before Using the Integrated Drilling and Piling Machine:

 

  1. Before use, check the mechanical structure and the hydraulic system, as well as the water level in the diesel engine's water tank and the motor oil level. If everything is normal, you can start the diesel engine. After running at a low speed without load for 3-5 minutes, you can begin work.
  2.  

Operational Precautions for the Integrated Drilling and Piling Machine:

 

  1. Due to the machine's working environment being prone to intense vibrations and impacts, constantly observe the dynamics of various parts during operation. If you detect abnormal noise or other irregularities, shut down the machine immediately for inspection and repair before resuming operation. If hydraulic system connectors leak or components become loose, shut down the machine for adjustment and tightening. After ensuring everything is normal, you can resume operation. Before completing each shift, lower the hydraulic hammer to the lowest position and retract all other hydraulic cylinders to their shortest length. If moving a distance, keep the mast leaning backward. For the machine's components, accessories, and electrical equipment, perform regular inspections, especially the connections in the wiring of the motor. During operation, there should be designated personnel for guidance. The guide and the operator should check signals with each other before work and cooperate closely. At the start, use a bell or other methods to signal and inform surrounding personnel to move away. The machine should start at a low speed and gradually accelerate to high speed.
  2.  

After 100 hours of operation, replace the engine oil, gear oil, motor oil, and brake fluid.

Clean the air filter daily before drilling operations.

 

Before each day's operation, refill the 29 grease points with grease.

Share
slurry pump companies

Zen Young Technology Hebei Co., Ltd. Specialized in Slurry pump solutions, Foundry OEM services, Drilling rigs and drilling tools, and Air compressors for world wide industries of mining, metallurgy, municipal construction, power, dredging, petrochemical, etc.

icon1icon2icon3icon4

Copyright © 2025 Zen Young Technology Hebei Co.,Ltd. All Rights Reserved. Sitemap | Privacy Policy

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.