Высокоподъемный грязевой насос
The production of rubber slurry pumps begins with the selection of high-quality materials. The primary components of these pumps include the pump casing, impeller, and wear components, all of which are crucial for efficient performance. Rubber, due to its excellent resilience and wear resistance, is widely used in constructing these components. Factories often source synthetic rubber, such as polyurethane, to enhance durability further, especially in harsh operating conditions.
The Role of a Roof Covering Manufacturer in Modern Architecture
Applications in Various Industries
Through the continuous execution of these key steps, we can not only ensure the stability and high efficiency of the drilling rig but also significantly reduce long-term operational costs. Remember, good maintenance habits are the foundation for ensuring the long-term stable operation of the equipment. Let's start today, together for the health and longevity of the drilling rig.
When it comes to the advantages of manganese jaw plates, their longevity and resilience stand out. The ability to withstand abrasive materials without excessive wear ensures that mining operations can run smoothly with minimal interruptions. This aspect not only contributes to cost savings but also reduces the frequency of maintenance and replacement of jaw plates.
В заключение, производство грязных насосов в Кыргызстане - это перспективная отрасль, способная стать двигателем экономического роста. Учитывая уникальные условия страны, производители могут создать инновационные решения, которые будут востребованы не только на внутреннем, но и на внешнем рынках. Заводы, которые осознают важность качества и устойчивого развития, смогут занять свою нишу и способствовать улучшению экологической ситуации, обеспечивая надежное решение для очистки воды и дренажа.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank