conception de la pompe de boue


(3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.
The horizontal slurry pump should be used for regular maintenance. This can effectively avoid the problem of slurry pump blockage, and if you encounter these problems in the process of using slurry pump in the later stage, you can solve them according to the above steps.

...

Safety is another paramount concern in drilling operations. The drilling process inherently carries risks, and improper perforation techniques can lead to blowouts or leaks, resulting in catastrophic consequences. By adhering to industry standards and guidelines encapsulated in measurements like 3 32, companies can implement safety protocols that significantly reduce risks. It is vital that all stakeholders in the drilling process, from geological engineers to health and safety officers, understand and apply these standards.


...

Чулуу бутлуур нь барилга, зам барилгын салбарт хэрэглэгддэг чухал төхөөрөмж юм. Энэ төхөөрөмж нь том хэмжээний чулуу, хүдэр зэрэг материалуудыг жижиг, зөөлөн хэсгүүдэд хуваах, бутлах зориулалттай. Чулуу бутлуурын плита нь энэ төхөөрөмжийн гол бүрдэл хэсэг бөгөөд бутлах процессыг амжилттай гүйцэтгэхэд чухал үүрэгтэй.


...

ضواغط الهواء المحمولة اللولبية هي آلات تقوم بضغط الهواء باستخدام آليات لولبية. تتميز هذه الضواغط بقدرتها على توليد كميات كبيرة من الهواء المضغوط بكفاءة عالية، مما يجعلها خيارًا مثاليًا للاستخدام في المواقع التي تحتاج إلى هواء مضغوط بشكل منتظم.


...


(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank

...