5 8 буровые штылки

디젤 공기 압축기(90 CFM)는 그 효율성과 내구성 덕분에 다양한 분야에서 널리 사용되고 있습니다. 특히 건설, 농업, 자동차 정비 등 여러 산업에서 중요한 역할을 하고 있으며, 작업의 효율성을 높이는 데 큰 기여를 하고 있습니다. 따라서 적절한 관리와 유지보수를 통해 이 장비를 최대한 활용하는 것이 중요합니다. 디젤 공기 압축기는 앞으로도 지속적으로 많은 산업 현장에서 없어서는 안 될 장비로 자리매김할 것입니다.


...

The DTH hammer operates through compressed air, which is pumped through a series of valves and chambers within the hammer. When the air pressure builds up, it drives a piston that strikes the drill bit, creating a powerful force that breaks the material. This process continues in rapid succession, allowing the drill bit to penetrate the ground efficiently. The design of the DTH hammer allows for a larger drop height of the piston than traditional rotary drills, resulting in higher impact energy and better drilling performance.


...

In addition to its durability, the tungsten crusher model is designed for high efficiency. The crushing process often involves multiple stages, where larger pieces of ore are progressively reduced in size. Advanced technology such as hydraulic systems and automated controls can enhance throughput and improve the overall processing performance. These innovations not only save time but also reduce operational costs, making tungsten extraction more economically viable.


...

  • Due to the machine's working environment being prone to intense vibrations and impacts, constantly observe the dynamics of various parts during operation. If you detect abnormal noise or other irregularities, shut down the machine immediately for inspection and repair before resuming operation. If hydraulic system connectors leak or components become loose, shut down the machine for adjustment and tightening. After ensuring everything is normal, you can resume operation. Before completing each shift, lower the hydraulic hammer to the lowest position and retract all other hydraulic cylinders to their shortest length. If moving a distance, keep the mast leaning backward. For the machine's components, accessories, and electrical equipment, perform regular inspections, especially the connections in the wiring of the motor. During operation, there should be designated personnel for guidance. The guide and the operator should check signals with each other before work and cooperate closely. At the start, use a bell or other methods to signal and inform surrounding personnel to move away. The machine should start at a low speed and gradually accelerate to high speed.
  • ...