china slurry pump
DTH drilling refers to a method where the drilling bit is located at the end of a drill string, below the surface of the ground. This technique is distinguished by the use of high-performance percussion hammers, which are positioned on the drill bit. DTH drilling involves the use of compressed air to deliver rapid impacts, breaking rock into smaller fragments. This method is particularly effective in hard rock formations, making it a preferred choice for mining operations and various drilling applications.
- Mining In mineral exploration and extraction, DTH drilling provides fast and efficient drilling of blast holes, contributing to improved overall productivity in mines.
2. Marine Construction When constructing offshore platforms, bridges, or wind farms, the stability of foundations is paramount. Hammer drilling provides a reliable method to secure pilings and conduct deep foundation work, ensuring that structures can withstand harsh marine conditions.
Vertical slag pumps are indispensable for industries that handle molten and abrasive materials. Their specialized design, combined with advancements in materials and engineering, ensures efficient and safe transportation of byproducts. As industries continue to seek efficient solutions for waste management and materials handling, the role of vertical slag pumps will become increasingly significant. Manufacturers like Weir Group, KSB, Schurco Slurry, ITT Goulds Pumps, and Xylem are at the forefront, providing high-quality pumping solutions that meet the demanding requirements of various sectors. Understanding the capabilities and applications of these pumps can aid industries in improving productivity and safety in their operations.
4. 이동성 많은 디젤 압축기는 이동이 용이하도록 설계되어 있습니다. 바퀴가 달려 있어 다양한 작업 현장에 쉽게 이동할 수 있으며, 이는 작업의 유연성을 높이는 데 도움이 됩니다.
compresseur d'air diesel 90 cfm

The main components of submarine hammer drilling equipment include the drill rig, hammer, drill pipes, and the drill bit. The drill rig is often mounted on a surface vessel or a floating platform and is designed to support the excessive weight and dynamic forces encountered during drilling operations.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank