- Xây dựng Trong xây dựng, máy nén khí được sử dụng để vận hành các công cụ như búa khoan, máy cắt, và các thiết bị khác yêu cầu khí nén.
Construction projects often involve the handling of slurries, cement, and other abrasive materials. Self-priming slurry pump solutions streamline the pumping process, reducing labor costs and speeding up project timelines. These pumps are versatile, efficient, and essential for construction sites worldwide.
Construction projects often involve the handling of slurries, cement, and other abrasive materials. Self-priming slurry pump solutions streamline the pumping process, reducing labor costs and speeding up project timelines. These pumps are versatile, efficient, and essential for construction sites worldwide.
The versatility of portable rotary air compressors allows them to be utilized across a variety of sectors
High density slurry pumps are essential components in industrial equipment, especially in the realm of pumps and vacuum devices. These specialized pumps are designed to handle abrasive and high-density slurries, making them ideal for a wide range of applications in industries such as mining, construction, and wastewater treatment.
High density slurry pumps are essential components in industrial equipment, especially in the realm of pumps and vacuum devices. These specialized pumps are designed to handle abrasive and high-density slurries, making them ideal for a wide range of applications in industries such as mining, construction, and wastewater treatment.
1. Depth and Efficiency One of the most significant advantages of DTH rigs is their ability to drill to greater depths compared to conventional rotary drilling methods. They are capable of drilling depths exceeding 100 meters with great precision, which is essential in mining operations for reaching ore deposits.
Herstellung von Sandpumpen Ein Blick auf den Markt und die Technologien
1. Offshore Oil and Gas Exploration In the oil and gas industry, submarine hammer drilling is crucial for the installation of subsea pipelines and wellheads. The ability to efficiently penetrate the seabed allows for the secure placement of infrastructure that can transport hydrocarbons from extraction points to processing facilities.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.