After 100 hours of operation, replace the engine oil, gear oil, motor oil, and brake fluid.
Additionally, submarine hammer drilling is a versatile technique, suitable for various applications, including the installation of underwater pipelines, foundations for offshore structures, and the recovery of geological samples for research and analysis. This adaptability makes it an essential tool in the fields of marine engineering, environmental research, and resource extraction.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
02 REGULAR INSPECTION
5. Eccentric Shaft
There are several types of drainage pumps, each designed for specific applications
En el mundo de la metalurgia, los laminadores son fundamentales para procesar y transformar metales en productos de diversas formas y tamaños. Un componente crítico en la operación de estos laminadores son los chocks o bloques de soporte, que juegan un papel esencial en el funcionamiento eficiente y seguro de esta maquinaria. En este artículo, exploraremos la importancia de los chocks en los laminadores, sus funciones y los desafíos asociados a su mantenimiento y operación.
- Tiết kiệm nhiên liệu Các máy nén khí di động diesel hiện đại được thiết kế để tiết kiệm nhiên liệu, giúp giảm chi phí vận hành trong thời gian dài.
The reason:
Inlet valve is not open or has silted
Suction line resistance is too high or blocked
Suction height is too high
Inlet valve is not open or has silted
Suction line resistance is too high or blocked
Suction height is too high