насосный раствор
Conclusion
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
Additionally, submarine hammer drilling is a versatile technique, suitable for various applications, including the installation of underwater pipelines, foundations for offshore structures, and the recovery of geological samples for research and analysis. This adaptability makes it an essential tool in the fields of marine engineering, environmental research, and resource extraction.
Чулуу бутлуурын бүтцийн талаар ярихдаа, плита нь нийтдээ хоёр үйлдэлтэй - нэг нь бутлах, нөгөө нь жийгдэх үйлдэл. Эхний үйлдэл нь өндөр даралтаар чулууг таслах бөгөөд хоёрдахь үйлдэл нь жижиг хэсгүүдийг цуглуулах, боловсруулах зориулалттай. Плитагийн дотоод бүтэц нь блок, хагас хагас, тал дундын хэлбэртэй байх боломжтой бөгөөд энэ нь түүний гүйцэтгэлд нөлөөлдөг.
placa de triturador de pedras

4. Robust Supply Chain Establishing partnerships with Chinese manufacturers can streamline supply chains, ensuring timely deliveries and a consistent supply of spare parts and accessories, which are crucial for maintaining operational continuity.
Heavy slurry pumps are designed to transport mixtures of liquid and solid particles, which can be abrasive and corrosive. These pumps are built to withstand challenging conditions, offering durability and reliability. Typically constructed from materials such as high chrome iron or rubber, they are engineered to handle slurries with different densities, viscosities, and particle sizes. The high-capacity pumps can manage large volumes, making them a preferred choice in sectors that require the efficient movement of sediment-laden fluids.
The pitman is a crucial component that transmits motion from the toggle mechanism to the movable jaw plate. It typically features a connection to the eccentric shaft, which causes the pitman to move in an elliptical arc. This movement is essential for achieving the force necessary to crush the materials effectively. The pitman must be robust and designed to handle the stresses of operation.
Cleaning method:
Open valve or desilting
Improved design of suction lines or desilting
Lower mounting height
Open valve or desilting
Improved design of suction lines or desilting
Lower mounting height