centrifugal vertical pump
Submarine hammer drilling, often referred to as underwater percussion drilling, is an advanced technique utilized primarily in marine construction and resource exploration. This method combines the principles of traditional drilling with hydraulic and pneumatic operations, enabling the effective penetration of hard substrates beneath the sea floor. In this article, we will explore the processes, equipment, advantages, and applications of submarine hammer drilling.
Applications
3. Horsepower (HP) The horsepower needed to drive the mud pump is determined by the flow rate and pressure. The formula for calculating pump horsepower is
One of the standout features of the Новый 185 CFM air compressor is its impressive airflow capacity, delivering 185 cubic feet per minute (CFM). This ample output enables the compressor to power multiple tools, such as impact wrenches, jackhammers, and nail guns, simultaneously. For contractors and industrial workers, this means enhanced productivity and streamlined operations. Whether on a construction site or in a manufacturing environment, having access to high CFM rates ensures that tasks are completed efficiently and effectively.
The reason:The suction pipe is not filled with water
Blocked suction line or inadequate valve opening
The inlet pipe of the pump, the meter or the stuffing box are serious
Blocked suction line or inadequate valve opening
The inlet pipe of the pump, the meter or the stuffing box are serious
3. Environmental Assessments Environmental scientists often employ submarine hammer drilling to collect sediment cores and geological samples from the seabed. This data is essential for assessing the health of marine ecosystems and understanding sedimentology for future projects.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank