tipo de bomba de lama
By continuously carrying out these key steps, we can not only ensure the stable and efficient operation of the drilling rig but also significantly reduce long-term operational costs. Remember, good maintenance habits are the foundation for ensuring the long-term stable operation of the equipment. Let's start today, together for the health and longevity of the drilling rig.
- Construction Sites During construction, especially in areas with high groundwater levels, drainage pumps are vital for keeping sites dry, allowing work to continue without interruption.
The reason:
Inlet valve is not open or has silted
Suction line resistance is too high or blocked
Suction height is too high
The reason:
Inlet valve is not open or has silted
Suction line resistance is too high or blocked
Suction height is too high