4. Renewable Energy Projects With the rise of offshore wind energy, submarine hammer drilling is increasingly used to install the foundations for wind turbines. The ability to achieve deep penetration in various seabed conditions makes this method invaluable in the renewable energy sector.
When the crawler pile driver is drilling, the current of the pile driver's ammeter shall not exceed 100A. If the ammeter current exceeds 100A, the drill pipe should stop and descend slowly, and the rotor always keeps turning. If the current drops below 100 amps and is stable, the drill pipe can continue to decline slowly.
2. سهولة النقل تتميز الضواغط المحمولة بخفة وزنها وحجمها الصغير، مما يسهل نقلها من موقع لآخر. هذه الميزة تجعلها مثالية للاستخدام في مواقع العمل المتغيرة مثل مواقع البناء أو المشاريع الميدانية.
4. Massenza Drilling Rig Known for its specialized drilling rigs and equipment, Massenza also manufactures DTH hammers that emphasize efficiency and precision. Their products are often used in complex drilling environments.
3. Effluent Pumps Specifically intended for the removal of grey water or light solids, effluent pumps can also be effectively utilized for mud evacuation, provided the sediment is not too thick or heavy.
pompes d'évacuation de boue

Portable rotary air compressors use a rotary mechanism to compress air, in contrast to piston-driven models. This design allows for continuous airflow and higher efficiency, making them more suitable for heavy-duty applications. They are built to be lightweight and compact, ensuring easy transportation and usability across various job sites.
The hammer itself can be operated using a pneumatic or hydraulic system, with hydraulic hammers being the preferred choice in most cases due to their consistent performance and reliability. The drill bit used is often designed specifically for marine environments, featuring reinforced materials and cutting edges optimized for hard substrates.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank