venda de compressor 185 cfm
Submarine hammer drilling sees extensive applications in several sectors
Down-the-hole hammer drilling has revolutionized the way industries approach drilling challenges. Its unmatched efficiency, precision, and versatility have made it an indispensable tool in mining and construction. As technology continues to advance, DTH drilling is expected to evolve further, opening new avenues for exploration and development in various sectors. By embracing this innovative approach, companies can not only improve their operational performance but also contribute to sustainable practices in resource extraction and infrastructure development. As the demand for effective drilling solutions grows, DTH hammer drilling will undoubtedly play a crucial role in shaping the future of these industries.
In order to accurately align the pile position, the crawler pile frame can be allowed to walk and move the pile position and rotate the mechanism. When the position of the rotating pile frame is not accurate, you can continue to walk back and forth or rotate to ensure accuracy.
Construction Sector
Construction Sector
디젤 공기 압축기(90 CFM)는 그 효율성과 내구성 덕분에 다양한 분야에서 널리 사용되고 있습니다. 특히 건설, 농업, 자동차 정비 등 여러 산업에서 중요한 역할을 하고 있으며, 작업의 효율성을 높이는 데 큰 기여를 하고 있습니다. 따라서 적절한 관리와 유지보수를 통해 이 장비를 최대한 활용하는 것이 중요합니다. 디젤 공기 압축기는 앞으로도 지속적으로 많은 산업 현장에서 없어서는 안 될 장비로 자리매김할 것입니다.
DTH hammer drilling is widely utilized in various sectors, including
Durability and Reliability
185 cfm portable air compressor

Another pivotal factor in the manufacturer selection process is post-sale support and service. Gravel pump manufacturers that offer comprehensive warranties, maintenance services, and technical support often stand out in a competitive market. Clients need reassurance that they can rely on their manufacturers for assistance in case of repairs or operational queries, contributing to a smoother workflow and enhanced efficiency.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank