cubierta de bomba de lodo
Conclusion
Through the continuous execution of these key steps, we can not only ensure the stability and high efficiency of the drilling rig but also significantly reduce long-term operational costs. Remember, good maintenance habits are the foundation for ensuring the long-term stable operation of the equipment. Let's start today, together for the health and longevity of the drilling rig.
4. Flute Design The flute or cavity of the spiral drill bit is designed to efficiently remove debris and chips generated during the drilling process. This feature helps to prevent clogging, which can slow down the operation and affect the quality of the finished hole.
3. Heavy-Duty or Construction Pumps These are specialized pumps designed for large-scale operations, such as construction sites. They can handle larger volumes of water and solids, making them ideal for dewatering trenches or excavations.
bombas de drenagem.

(1) If the horizontal slurry pump causes a blockage of solid hard deposits in the volute, measures can be taken to remove the blockage.
(2) If the shaft is different from the stuffing box axis, it is mainly due to processing errors and incorrect installation. Then pay attention to check whether the installation is correct after installation. If the sealing water ring is badly worn, a new water ring needs to be replaced. If the sealing water pipe is blocked, the sealing water cannot enter the middle of the packing, resulting in rapid wear of the packing, resulting in material leakage, you should dredge the blocked water pipe and keep the sealing water clean.
(3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.
(1) If the horizontal slurry pump causes a blockage of solid hard deposits in the volute, measures can be taken to remove the blockage.
(2) If the shaft is different from the stuffing box axis, it is mainly due to processing errors and incorrect installation. Then pay attention to check whether the installation is correct after installation. If the sealing water ring is badly worn, a new water ring needs to be replaced. If the sealing water pipe is blocked, the sealing water cannot enter the middle of the packing, resulting in rapid wear of the packing, resulting in material leakage, you should dredge the blocked water pipe and keep the sealing water clean.
(3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.