projeto de bomba de escória centrífuga
3. The speed of the pump is too high, in the metallurgical industry or heavy medium coal preparation containing large particles, the speed is too high, which will greatly shorten the service life of the pump flow parts, cause the user to increase the cost, on-site maintenance frequency and other problems.
(3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.
The horizontal slurry pump should be used for regular maintenance. This can effectively avoid the problem of slurry pump blockage, and if you encounter these problems in the process of using slurry pump in the later stage, you can solve them according to the above steps.
(3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.
The horizontal slurry pump should be used for regular maintenance. This can effectively avoid the problem of slurry pump blockage, and if you encounter these problems in the process of using slurry pump in the later stage, you can solve them according to the above steps.