Компания по бурильной трубе и инструментальной стали

  • Due to the machine's working environment being prone to intense vibrations and impacts, constantly observe the dynamics of various parts during operation. If you detect abnormal noise or other irregularities, shut down the machine immediately for inspection and repair before resuming operation. If hydraulic system connectors leak or components become loose, shut down the machine for adjustment and tightening. After ensuring everything is normal, you can resume operation. Before completing each shift, lower the hydraulic hammer to the lowest position and retract all other hydraulic cylinders to their shortest length. If moving a distance, keep the mast leaning backward. For the machine's components, accessories, and electrical equipment, perform regular inspections, especially the connections in the wiring of the motor. During operation, there should be designated personnel for guidance. The guide and the operator should check signals with each other before work and cooperate closely. At the start, use a bell or other methods to signal and inform surrounding personnel to move away. The machine should start at a low speed and gradually accelerate to high speed.
  • ...


    (1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
    (2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
    (4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
    (5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
    (6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank

    ...


    (1) If the horizontal slurry pump causes a blockage of solid hard deposits in the volute, measures can be taken to remove the blockage.
    (2) If the shaft is different from the stuffing box axis, it is mainly due to processing errors and incorrect installation. Then pay attention to check whether the installation is correct after installation. If the sealing water ring is badly worn, a new water ring needs to be replaced. If the sealing water pipe is blocked, the sealing water cannot enter the middle of the packing, resulting in rapid wear of the packing, resulting in material leakage, you should dredge the blocked water pipe and keep the sealing water clean.
    (3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.

    ...

    In addition to oil and gas and mining, sectors such as construction and geothermal energy are also contributing to the surge in demand for drilling equipment. The construction industry requires drilling equipment for foundation work, site preparation, and tunneling projects, while the geothermal sector relies on specialized drilling rigs to tap into the Earth's heat. This diversification illustrates the versatility of drilling equipment and highlights its importance across multiple industries.


    ...

    Before delving into calculations, it's key to understand how a mud pump operates. Most modern drilling rigs use either triplex or duplex pumps, which use a series of pistons to create pressure. The fluid is drawn into the pump from a storage tank and pumped down the drill string. After reaching the drill bit, the mud carries cuttings back up to the surface through the annulus (the space between the drill string and the wellbore).


    ...

    The eccentric shaft is another significant part of the jaw crusher's design. It is the component that imparts the crushing motion to the movable jaw plate through the pitman. As the eccentric shaft rotates, it creates an oscillating motion that allows the jaw plates to open and close. The shaft is usually made of high carbon steel for strength and durability, allowing it to withstand the heavy forces encountered during operation.


    ...