cubierta de bomba de lodo oem
Les barres de forage sont traditionnellement fabriquées en acier, mais différents alliages et traitements peuvent être utilisés pour répondre aux besoins spécifiques de durabilité et de robustesse. En général, les matériaux utilisés doivent résister à des conditions de travail extrêmes, notamment à des pressions élevées, à des températures élevées et à l'usure due à l'abrasion.
1. Offshore Oil and Gas Exploration In the oil and gas industry, submarine hammer drilling is crucial for the installation of subsea pipelines and wellheads. The ability to efficiently penetrate the seabed allows for the secure placement of infrastructure that can transport hydrocarbons from extraction points to processing facilities.
1.Downhole drilling machine: When drilling a downhole gun hole with a aperture less than 150 mm, in addition to the application of a rock drill, it can also be used to drill a small diameter of 80 ~ 150 mm. When drilling a gun hole with a diameter of less than 70 mm in coal or softer mineral rock, it is generally used to drill or air drill, driven by a motor (or air motor) to drill the drill pipe, and the rock (coal) chips drilled out are discharged through the spiral groove on the drill pipe.
What is a DTH Hammer?
(1) If the horizontal slurry pump causes a blockage of solid hard deposits in the volute, measures can be taken to remove the blockage.
(2) If the shaft is different from the stuffing box axis, it is mainly due to processing errors and incorrect installation. Then pay attention to check whether the installation is correct after installation. If the sealing water ring is badly worn, a new water ring needs to be replaced. If the sealing water pipe is blocked, the sealing water cannot enter the middle of the packing, resulting in rapid wear of the packing, resulting in material leakage, you should dredge the blocked water pipe and keep the sealing water clean.
(3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.
(1) If the horizontal slurry pump causes a blockage of solid hard deposits in the volute, measures can be taken to remove the blockage.
(2) If the shaft is different from the stuffing box axis, it is mainly due to processing errors and incorrect installation. Then pay attention to check whether the installation is correct after installation. If the sealing water ring is badly worn, a new water ring needs to be replaced. If the sealing water pipe is blocked, the sealing water cannot enter the middle of the packing, resulting in rapid wear of the packing, resulting in material leakage, you should dredge the blocked water pipe and keep the sealing water clean.
(3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.