slurry handling pump
In the mining sector, the tungsten crusher contributes to the extraction process by preparing ore for downstream processing. Properly crushed tungsten ore can be more easily concentrated through methods such as gravity separation or flotation. This is vital because impurities in ore can hinder the quality and performance of the final tungsten products.
modelo de triturador de tungsteno.

Энэ бүхний үндсэн дээр, чулуу бутлуурын плита нь барилгын материалын бутлах үйл явцын зүрх сэтгэл бөгөөд үүнээс шалтгаалан бидний бүтээн байгуулалт, хөгжлийг дэмжих чухал сталаар ажилладаг.
The pile driver should pay attention to the following points during the piling process to avoid accidents:
3. Open-air drilling rig: according to the different working mechanism of crushing ore and rock, it is divided into steel rope percussion drill, drilling rig, cone drill and rotary drill. Because of low efficiency, the steel rope percussion drill has been gradually replaced by other drilling RIGS. The drill pipe drives the pneumatic impactor and the drill bit to rotate together, and the piston of the pneumatic impactor is used to impact the drill bit to break the ore and rock, which is usually used in small and medium-sized mines to drill holes with a diameter of 80 to 250 mm.
In addition to its durability, the tungsten crusher model is designed for high efficiency. The crushing process often involves multiple stages, where larger pieces of ore are progressively reduced in size. Advanced technology such as hydraulic systems and automated controls can enhance throughput and improve the overall processing performance. These innovations not only save time but also reduce operational costs, making tungsten extraction more economically viable.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank