3 polegadas de perfuração de pedra
Another significant advantage is the pump’s ability to operate under harsh conditions. The ZJ slurry pump is built to withstand high temperatures and corrosive environments, thanks to its selection of materials, including stainless steel and reinforced elastomers. This resilience results in fewer breakdowns and a longer service life, ensuring consistent productivity.
zj slurry pump

Máy nén khí di động diesel mang lại nhiều lợi ích quan trọng, bao gồm
Conducting a detailed inspection at least once a week can help us detect and address signs of wear or damage in a timely manner. This is particularly important for high-wear components such as drill rods and drill bits. At the same time, do not forget to check all bolts and nuts to ensure they have not loosened due to vibration, which is key to ensuring the stability of the equipment.
The Martian atmosphere is composed primarily of carbon dioxide (about 95.3%), with traces of nitrogen (2.7%), argon (1.6%), and other gases. This composition, combined with the low pressure, leads to several unique environmental conditions on the planet.
El mantenimiento de los chocks es vital para el funcionamiento eficiente de los laminadores. Con el tiempo, el desgaste natural y las condiciones operativas pueden debilitar la estructura de los chocks. Las inspecciones regulares son necesarias para detectar cualquier signo de daño, como grietas o deformaciones. Ignorar el mantenimiento adecuado puede llevar a fallas catastróficas, que no solo provocan tiempos de inactividad prolongados, sino que también pueden resultar en costosas reparaciones y en la pérdida de materia prima.
Conclusion
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.