Through the continuous execution of these key steps, we can not only ensure the stability and high efficiency of the drilling rig but also significantly reduce long-term operational costs. Remember, good maintenance habits are the foundation for ensuring the long-term stable operation of the equipment. Let's start today, together for the health and longevity of the drilling rig.
(1) If the horizontal slurry pump causes a blockage of solid hard deposits in the volute, measures can be taken to remove the blockage.
(2) If the shaft is different from the stuffing box axis, it is mainly due to processing errors and incorrect installation. Then pay attention to check whether the installation is correct after installation. If the sealing water ring is badly worn, a new water ring needs to be replaced. If the sealing water pipe is blocked, the sealing water cannot enter the middle of the packing, resulting in rapid wear of the packing, resulting in material leakage, you should dredge the blocked water pipe and keep the sealing water clean.
(3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.
(1) If the horizontal slurry pump causes a blockage of solid hard deposits in the volute, measures can be taken to remove the blockage.
(2) If the shaft is different from the stuffing box axis, it is mainly due to processing errors and incorrect installation. Then pay attention to check whether the installation is correct after installation. If the sealing water ring is badly worn, a new water ring needs to be replaced. If the sealing water pipe is blocked, the sealing water cannot enter the middle of the packing, resulting in rapid wear of the packing, resulting in material leakage, you should dredge the blocked water pipe and keep the sealing water clean.
(3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.
One of the standout features of 185% compressors is their robust pressure output. They usually provide air pressure ranges from 100 to 125 psi, suitable for driving pneumatic tools such as jackhammers, nail guns, and sanders. Additionally, many models offer adjustable pressure settings, allowing operators to customize the flow of air according to specific requirements.
4. Эффективность Дизельные компрессоры обладают высокой топливной эффективностью, что позволяет снизить эксплуатационные расходы в долгосрочной перспективе. Несмотря на то что первоначальные инвестиции могут оказаться высокими, экономия на топливе и обслуживание часто окупает эти затраты.
Equipment and Technology
4. The average flow rate of the pipeline is too low, and the average flow rate of the pipeline is lower than the critical settlement deceleration, resulting in pipeline blockage and unable to transport slurry normally. Through the above examples, it can be seen that the selection of ZJ series slurry pump is more complicated, and if any link makes a mistake, it may lead to the mistake of the entire selection, causing irreparable losses to users, and having an adverse impact on their reputation. Therefore, in the selection, we must pay attention to the values of several key coefficients and calculate them carefully to achieve accuracy, so that the ZJ series slurry pump can fully reflect its advantages in field application.
Moreover, the introduction of cool roofing materials, which reflect more sunlight and absorb less heat, has become essential in combating the urban heat island effect. These innovative products not only improve indoor comfort but also reduce energy consumption, contributing to a more sustainable environment.
Durability and Reliability
185 cfm portable air compressor

(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.