perforación de roca de 2 pulgadas
When the wind force is greater than level 6 during operation, the pile driver should stop the operation, and the oil cylinder should be used as an auxiliary support. If necessary, a wind rope should be added for fixing.When the crawler is piled, avoid the collision between the drill pipe reinforcement cage and other columns.
- Efficiency The right materials can significantly enhance the drilling speed and reduce downtime, leading to cost savings and increased productivity.
The reason:
Inlet valve is not open or has silted
Suction line resistance is too high or blocked
Suction height is too high
Inlet valve is not open or has silted
Suction line resistance is too high or blocked
Suction height is too high