The reason:
The suction pipe is not filled with water
Blocked suction line or inadequate valve opening
The inlet pipe of the pump, the meter or the stuffing box are serious
The suction pipe is not filled with water
Blocked suction line or inadequate valve opening
The inlet pipe of the pump, the meter or the stuffing box are serious
결론
Challenges and Considerations
Cleaning method:
Fill the pump with water
Content introduction
Problem: pump does not water, pressure gauge and true empty meter pointer beat violently.
Fill the pump with water
Content introduction
Problem: pump does not water, pressure gauge and true empty meter pointer beat violently.
In order to accurately align the pile position, the crawler pile frame can be allowed to walk and move the pile position and rotate the mechanism. When the position of the rotating pile frame is not accurate, you can continue to walk back and forth or rotate to ensure accuracy.
The primary advantage of vertical slag pumps is their ability to handle high temperatures and abrasive materials without significant wear and tear. These pumps often integrate advanced materials such as high chromium alloys that enhance durability and extend service life. Moreover, their vertical design minimizes the footprint, making them suitable for installations where space is limited.
Down-the-hole hammer drilling is a technique used primarily for drilling boreholes in hard rock applications. It employs a pneumatic hammer, situated directly at the drill bit, to deliver high-impact blows that effectively break up the rock. This method contrasts with traditional rotary drilling, where the drill bit operates at the surface and relies on torque and weight to penetrate the ground.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank