venda de barras de perfuração
The Significance of Manganese in Jaw Plates A Comprehensive Overview
1. Drill Bits The drill bit is the cutting tool at the end of the drill string responsible for penetrating rock layers. There are various types of drill bits, including roller cone bits, fixed cutter bits, and diamond bits, each designed for specific geological formations and drilling conditions. Selecting the right drill bit is crucial for maximizing penetration rates and minimizing costs.
Importance of Selecting the Right Materials
Benefits of Using 185% Compressors
185 compresseurs

Máy nén khí di động diesel là thiết bị sử dụng động cơ diesel để nén khí và có thể dễ dàng di chuyển đến nhiều địa điểm khác nhau. Với thiết kế nhỏ gọn, máy có thể được đặt trên xe tải hoặc được gắn trên các khung chở, cung cấp khả năng vận hành mạnh mẽ ngay cả trong những điều kiện làm việc khắc nghiệt.
디젤 공기 압축기는 디젤 엔진을 동력으로 하여 공기를 압축하는 장비입니다. 이 기계는 주로 건설 현장, 공장, 그리고 견고한 야외 작업 환경에서 사용됩니다. 압축된 공기는 다양한 도구와 기계를 작동시키는 데 필요한 에너지원으로 활용됩니다. 90 CFM의 출력은 일반적으로 소형 건설 장비나 공구를 동시에 운영하는 데 매우 효율적입니다.
Furthermore, in wastewater treatment plants, high density slurry pumps are used to transfer sludge and other waste materials, helping to streamline the treatment process and ensure compliance with environmental regulations. By choosing the right high density slurry pump for the job, operators can optimize efficiency and reduce the overall environmental impact of their operations.
Furthermore, in wastewater treatment plants, high density slurry pumps are used to transfer sludge and other waste materials, helping to streamline the treatment process and ensure compliance with environmental regulations. By choosing the right high density slurry pump for the job, operators can optimize efficiency and reduce the overall environmental impact of their operations.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank