utilização da bomba de escória
To ensure the effective operation of a sump pump designed for mud evacuation, regular maintenance is crucial. This includes routine inspections, cleaning out the sump basin, checking the float switch, and ensuring that the discharge line is clear of obstructions. Neglecting these maintenance tasks can lead to pump failure, potentially resulting in severe flooding or mud accumulation.
2. Portability Many CFM 185 models come equipped with wheels and a lightweight design, allowing for easy transportation across job sites. This mobility is a significant advantage for contractors and professionals working in various locations.
4. Versatility These compressors can power a wide range of pneumatic tools, making them suitable for various applications beyond construction. They are employed in landscaping, painting, and even in oil and gas operations, highlighting their versatility in different sectors.
The eccentric shaft is another significant part of the jaw crusher's design. It is the component that imparts the crushing motion to the movable jaw plate through the pitman. As the eccentric shaft rotates, it creates an oscillating motion that allows the jaw plates to open and close. The shaft is usually made of high carbon steel for strength and durability, allowing it to withstand the heavy forces encountered during operation.
Due to the machine's working environment being prone to intense vibrations and impacts, constantly observe the dynamics of various parts during operation. If you detect abnormal noise or other irregularities, shut down the machine immediately for inspection and repair before resuming operation. If hydraulic system connectors leak or components become loose, shut down the machine for adjustment and tightening. After ensuring everything is normal, you can resume operation. Before completing each shift, lower the hydraulic hammer to the lowest position and retract all other hydraulic cylinders to their shortest length. If moving a distance, keep the mast leaning backward. For the machine's components, accessories, and electrical equipment, perform regular inspections, especially the connections in the wiring of the motor. During operation, there should be designated personnel for guidance. The guide and the operator should check signals with each other before work and cooperate closely. At the start, use a bell or other methods to signal and inform surrounding personnel to move away. The machine should start at a low speed and gradually accelerate to high speed.
The reason:The suction pipe is not filled with water
Blocked suction line or inadequate valve opening
The inlet pipe of the pump, the meter or the stuffing box are serious
Blocked suction line or inadequate valve opening
The inlet pipe of the pump, the meter or the stuffing box are serious