5mm drill rod
Les barres de forage, ou drill rods en anglais, jouent un rôle crucial dans l'industrie de l'exploration minière et pétrolière. Elles constituent un élément essentiel des équipements de forage, permettant de percer le sol et d'atteindre les profondeurs nécessaires pour explorer les ressources naturelles. Dans cet article, nous examinerons les différents types de barres de forage, leurs matériaux, ainsi que leur importance et leur application dans l'industrie.
Submarine hammer drilling, often referred to as underwater percussion drilling, is an advanced technique utilized primarily in marine construction and resource exploration. This method combines the principles of traditional drilling with hydraulic and pneumatic operations, enabling the effective penetration of hard substrates beneath the sea floor. In this article, we will explore the processes, equipment, advantages, and applications of submarine hammer drilling.
Moreover, the competitive landscape of the drilling equipment market has intensified due to the entry of new players and the globalization of supply chains. Manufacturers are now competing not just on price but also on technology and service quality. The collaboration between equipment manufacturers and end-users is becoming more prevalent, resulting in tailored solutions that address specific operational challenges.
In today’s world, environmental sustainability is a paramount concern. The Slurry Pump Blade Factory is at the forefront of integrating eco-friendly practices into its manufacturing processes. The factory implements energy-efficient technologies and recycles materials wherever possible, reducing its carbon footprint. Furthermore, the pumps produced are designed to minimize energy consumption during operation, contributing to lower greenhouse gas emissions in various industrial applications.
Advantages of Submarine Hammer Drilling
Exploring the Importance of Water Well Drilling The Case for Sustainable Water Solutions
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank