down the hole drill bits
The Importance of Mining Slurry Pumps
1, according to the use of the address is not the same, the drill can be divided into underground and open air two categories. According to the presence or absence of traveling structure, the drilling rig can be divided into self-propelled type and non-self-propelled type. There are many open-pit drilling RIGS in China, most of which are self-propelled.
1, according to the use of the address is not the same, the drill can be divided into underground and open air two categories. According to the presence or absence of traveling structure, the drilling rig can be divided into self-propelled type and non-self-propelled type. There are many open-pit drilling RIGS in China, most of which are self-propelled.
1. Cost-Effectiveness Chinese manufacturers often offer lower prices without compromising quality, making them an attractive option for businesses looking to optimize their operational costs.
Mining slurry pumps are designed to handle abrasive materials, including gravel, sand, and other particulates mixed with water. Their construction typically features robust materials like high-chrome alloys or rubber linings designed to withstand harsh conditions and minimize wear. The pumps are specifically engineered to handle high solid content and varying densities, making them indispensable in mining applications.
One of the standout characteristics of the ZJ slurry pump is its ability to handle a wide range of solid concentrations, from light to heavy slurries. This flexibility allows industries to use a single type of pump for multiple applications, simplifying their equipment inventory and reducing maintenance costs.
ضواغط الهواء المحمولة اللولبية هي آلات تقوم بضغط الهواء باستخدام آليات لولبية. تتميز هذه الضواغط بقدرتها على توليد كميات كبيرة من الهواء المضغوط بكفاءة عالية، مما يجعلها خيارًا مثاليًا للاستخدام في المواقع التي تحتاج إلى هواء مضغوط بشكل منتظم.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank