pompe à boue
2. Increased Accuracy The DTH method offers superior hole quality, producing straighter boreholes with less deviation. This precision is vital for applications that require exact placement of blast holes or geothermal probes.
Applications in the Mining Industry
Cleaning method:
Fill the pump with water
Open the inlet door and clean the clogged part of the pipeline
Plug the leak area and check whether the packing is wet or compressed
Fill the pump with water
Open the inlet door and clean the clogged part of the pipeline
Plug the leak area and check whether the packing is wet or compressed
The reason:
Inlet valve is not open or has silted
Suction line resistance is too high or blocked
Suction height is too high
Inlet valve is not open or has silted
Suction line resistance is too high or blocked
Suction height is too high