3. Open-air drilling rig: according to the different working mechanism of crushing ore and rock, it is divided into steel rope percussion drill, drilling rig, cone drill and rotary drill. Because of low efficiency, the steel rope percussion drill has been gradually replaced by other drilling RIGS. The drill pipe drives the pneumatic impactor and the drill bit to rotate together, and the piston of the pneumatic impactor is used to impact the drill bit to break the ore and rock, which is usually used in small and medium-sized mines to drill holes with a diameter of 80 to 250 mm. The roller drill uses the rolling action of the roller bit to break the rock and is suitable for drilling holes of 150 ~ 440 mm in diameter on the hard rock. It has the advantages of high efficiency and low labor intensity, and is widely used in large and medium-sized open-pit metal mines. The drill consists of an impactor (or drill bit), a rotary mechanism, a lifting mechanism, a pressure device, a walking mechanism, a slag discharge system, a drill frame and a drill pipe. Rotary drilling machines are only suitable for drilling softer minerals and coal. The common feature of these devices is that the degree of automation is getting higher and higher, and some functions realize the application of intelligent i GPS technology on these RIGS, which realizes the automatic positioning of the boom, saves the time of field marking and positioning, improves the efficiency of the operation, and enables the operator to concentrate on monitoring the process of drilling. At the same time, more attention is paid to safety and environmental protection and the improvement of human-machine relationship. With the impact of the implementation of engine emission regulations, mobility, intelligent handling and environmental regulations Tier 3/ Euro ⅢA emission regulations, most foreign rig manufacturing companies have adopted diesel engines that meet the emission standards
Moreover, adherence to international quality standards, such as ISO certifications, is vital for manufacturers. These certifications not only enhance the credibility of the products but also ensure that they meet environmental and safety regulations.
5. Enhanced Safety Safety is a paramount concern in drilling operations. DTH hammer drilling minimizes the risks associated with traditional drilling methods, such as drill string failures or excessive vibration. The compact design of DTH equipment also allows for easier handling and reduced risk of accidents on job sites.
2. Marine Construction When constructing offshore platforms, bridges, or wind farms, the stability of foundations is paramount. Hammer drilling provides a reliable method to secure pilings and conduct deep foundation work, ensuring that structures can withstand harsh marine conditions.
(1) If the horizontal slurry pump causes a blockage of solid hard deposits in the volute, measures can be taken to remove the blockage.
(2) If the shaft is different from the stuffing box axis, it is mainly due to processing errors and incorrect installation. Then pay attention to check whether the installation is correct after installation. If the sealing water ring is badly worn, a new water ring needs to be replaced. If the sealing water pipe is blocked, the sealing water cannot enter the middle of the packing, resulting in rapid wear of the packing, resulting in material leakage, you should dredge the blocked water pipe and keep the sealing water clean.
(3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.
(1) If the horizontal slurry pump causes a blockage of solid hard deposits in the volute, measures can be taken to remove the blockage.
(2) If the shaft is different from the stuffing box axis, it is mainly due to processing errors and incorrect installation. Then pay attention to check whether the installation is correct after installation. If the sealing water ring is badly worn, a new water ring needs to be replaced. If the sealing water pipe is blocked, the sealing water cannot enter the middle of the packing, resulting in rapid wear of the packing, resulting in material leakage, you should dredge the blocked water pipe and keep the sealing water clean.
(3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.