When the wind force is greater than level 6 during operation, the pile driver should stop the operation, and the oil cylinder should be used as an auxiliary support. If necessary, a wind rope should be added for fixing.When the crawler is piled, avoid the collision between the drill pipe reinforcement cage and other columns.
...
2025-08-14 16:03
743