dth rig
Máy nén khí di động diesel Giải pháp hoàn hảo cho nhu cầu khí nén
1.Downhole drilling machine: When drilling a downhole gun hole with a aperture less than 150 mm, in addition to the application of a rock drill, it can also be used to drill a small diameter of 80 ~ 150 mm. When drilling a gun hole with a diameter of less than 70 mm in coal or softer mineral rock, it is generally used to drill or air drill, driven by a motor (or air motor) to drill the drill pipe, and the rock (coal) chips drilled out are discharged through the spiral groove on the drill pipe.
2. سهولة النقل تتميز الضواغط المحمولة بخفة وزنها وحجمها الصغير، مما يسهل نقلها من موقع لآخر. هذه الميزة تجعلها مثالية للاستخدام في مواقع العمل المتغيرة مثل مواقع البناء أو المشاريع الميدانية.
2. Marine Construction When constructing offshore platforms, bridges, or wind farms, the stability of foundations is paramount. Hammer drilling provides a reliable method to secure pilings and conduct deep foundation work, ensuring that structures can withstand harsh marine conditions.
Equipment and Technology
The term 185% compressors generally refers to portable air compressors that deliver high-performance output, typically rated at 185 cubic feet per minute (CFM). These compressors are designed for heavy-duty applications, making them ideal for construction sites, road works, and renovation projects. The 185% often signifies their exceptional performance relative to their size and fuel efficiency, underscoring their ability to deliver more compressed air than standard compressors within the same category.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank