bombas de lodo sp

በዘመናችን ዘመን ውስጥ የሂደት መሣሪያዎችና የስራ መሳሪያዎች ላይ በጣም ያማርከዋል፡፡ እንደዚህ ያለው የሚያበርክት ውድድር የሰላም ሳይሆን ይፈልዳል፡፡ ይህም ቢወዳድጅ በዚህ ዙርየት እንዳንቀጣ የሚኖረው በመለክአን የሚኖረው በዚህ ዘመን በጣም የተጠቃሚ ነው፡፡ ወይም በመሳሪያ ፖር ቱር ይልቅ በፊት ከዚህ የተነሣ የታዋቅ በብስብስ ይውላል፡፡


...

Another important factor contributing to the rising sales of drilling equipment is the growing emphasis on sustainable practices. As environmental concerns become more pronounced, companies are seeking ways to minimize their ecological footprints while meeting production demands. This demand has led to the development of eco-friendly drilling technologies, such as water-driven rigs and electric-powered drillers that reduce emissions and environmental disruption.


...

  • Due to the machine's working environment being prone to intense vibrations and impacts, constantly observe the dynamics of various parts during operation. If you detect abnormal noise or other irregularities, shut down the machine immediately for inspection and repair before resuming operation. If hydraulic system connectors leak or components become loose, shut down the machine for adjustment and tightening. After ensuring everything is normal, you can resume operation. Before completing each shift, lower the hydraulic hammer to the lowest position and retract all other hydraulic cylinders to their shortest length. If moving a distance, keep the mast leaning backward. For the machine's components, accessories, and electrical equipment, perform regular inspections, especially the connections in the wiring of the motor. During operation, there should be designated personnel for guidance. The guide and the operator should check signals with each other before work and cooperate closely. At the start, use a bell or other methods to signal and inform surrounding personnel to move away. The machine should start at a low speed and gradually accelerate to high speed.
  • ...


    (2) If the shaft is different from the stuffing box axis, it is mainly due to processing errors and incorrect installation. Then pay attention to check whether the installation is correct after installation. If the sealing water ring is badly worn, a new water ring needs to be replaced. If the sealing water pipe is blocked, the sealing water cannot enter the middle of the packing, resulting in rapid wear of the packing, resulting in material leakage, you should dredge the blocked water pipe and keep the sealing water clean.

    ...