1 forage.
3. Open-air drilling rig: according to the different working mechanism of crushing ore and rock, it is divided into steel rope percussion drill, drilling rig, cone drill and rotary drill. Because of low efficiency, the steel rope percussion drill has been gradually replaced by other drilling RIGS. The drill pipe drives the pneumatic impactor and the drill bit to rotate together, and the piston of the pneumatic impactor is used to impact the drill bit to break the ore and rock, which is usually used in small and medium-sized mines to drill holes with a diameter of 80 to 250 mm.
1. Robust Engine Performance The CFM 185 air compressor typically features a durable diesel engine, which ensures consistent power output and reliability. This is particularly important for heavy-duty tasks where interruptions can lead to inefficiencies.
Types of Drilling Machines
3. Flow Rate and Pressure Determine the required flow rate and the pressure at which the slurry needs to be transported. This will influence the type of pump chosen, as different pumps have specific performance curves.
- ITT Goulds Pumps A division of ITT Inc., Goulds Pumps is known for its diverse line of industrial pumps, including vertical models. Their focus on quality and innovation positions them as a reliable manufacturer in the market.
The Basics of Mars’ Atmosphere
Uchinchidan, burg'ulash vositalarining narxi bozordagi talab va taklifga ham bog'liq. Agar ma'lum bir burg'ulash vositasiga talab oshsa, uning narxi ham oshishi mumkin. Bu, ayniqsa, muayyan mintaqada yoki hududda resurslar izlashga bo'lgan talab kuchaysa, ya'ni mineral resurslarning qidiruvi kuchaysa, kuzatiladi.
prix de l'engin de forage

디젤 공기 압축기란?
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank