12 буровые штылки
Chocks en los Laminadores Elementos Clave en la Industria Metalúrgica
Conclusion
The following matters should be paid attention to during the use of the drilling rig, and the correct use can bring greater benefits
The following matters should be paid attention to during the use of the drilling rig, and the correct use can bring greater benefits
በቅርብ እንዲሕ ውሳኔ ቢይኖሪ በሚይukkut አነሳምይክቶቱ ለምርም ዳሩ ዬይወዛ፡፡
Before use, check the mechanical structure and the hydraulic system, as well as the water level in the diesel engine's water tank and the motor oil level. If everything is normal, you can start the diesel engine. After running at a low speed without load for 3-5 minutes, you can begin work.
Advancements in technology have led to improved performance and safety in downhole drilling operations. For instance, the development of advanced materials, like polycrystalline diamond compact (PDC) bits, has increased the durability and efficiency of drill bits, allowing them to cut through tougher formations at higher speeds.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
1.The selection of the pump is too large, and the flow and head are larger than the actual condition due to improper selection of the coefficient. This situation makes the pump in the operation process, cavitation phenomenon, resulting in premature damage of the pump flow parts under the combined action of cavitation and abrasion, in the case of serious cavitation, the pump will produce vibration and noise, and even lead to a sharp decline in the flow, head and efficiency of the pump can not run; In addition, the pump in the operation of large flow, will also cause motor overload, heat, serious will burn the motor.
(1) If the horizontal slurry pump causes a blockage of solid hard deposits in the volute, measures can be taken to remove the blockage.
(1) If the horizontal slurry pump causes a blockage of solid hard deposits in the volute, measures can be taken to remove the blockage.