pompe à boue lourde
The reason:
Inlet valve is not open or has silted
Suction line resistance is too high or blocked
Suction height is too high
Inlet valve is not open or has silted
Suction line resistance is too high or blocked
Suction height is too high
The top of the crawler piling rig column should be connected with a lightning rod according to the regulations, and the work should be stopped in case of thunderstorm during operation to protect personal and property safety.
There are several types of pumps commonly used for handling slurry, each with its own advantages and limitations
Mud evacuation is an essential aspect of property maintenance, particularly in areas prone to flooding. Sump pumps designed to handle muddy water are invaluable tools for protecting homes and businesses from the damaging effects of water and sediment buildup. By understanding the different types of sump pumps, their key features, and the importance of regular maintenance, property owners can ensure that they are equipped to manage the challenges posed by excessive moisture and mud effectively. Investing in the right sump pump not only protects physical assets but also contributes to a healthier living environment by preventing the growth of mold and other hazards associated with water damage.
Cleaning method:
Fill the pump with water
Open the inlet door and clean the clogged part of the pipeline
Plug the leak area and check whether the packing is wet or compressed
Fill the pump with water
Open the inlet door and clean the clogged part of the pipeline
Plug the leak area and check whether the packing is wet or compressed
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank