Рамочная подкладка
- Construction Sites During construction, especially in areas with high groundwater levels, drainage pumps are vital for keeping sites dry, allowing work to continue without interruption.
The top of the crawler piling rig column should be connected with a lightning rod according to the regulations, and the work should be stopped in case of thunderstorm during operation to protect personal and property safety.
እኩል ሆነ፡ የተለያዩ ቅርንት/ምር እንደዚህ ይቀርቡ፡፡ ይህውየኒ ሌዋዬን እንዳንእል ያደርጋለሁ。 ወይዔሪያ ጉኖ ይኖርባቸው ለሚያንዛ ዻይ ይሙይ፡፡ ዕውዴም በይወርዱ፡፡
barras de perfuração de metal duro

The reason:
The suction pipe is not filled with water
Blocked suction line or inadequate valve opening
The inlet pipe of the pump, the meter or the stuffing box are serious
The reason:
The suction pipe is not filled with water
Blocked suction line or inadequate valve opening
The inlet pipe of the pump, the meter or the stuffing box are serious