compresseur d'air portable moteur diesel
- Durability Look for pumps made of corrosion-resistant materials, especially if they will be exposed to harsh environments which can cause damage over time.
Before use, check the mechanical structure and the hydraulic system, as well as the water level in the diesel engine's water tank and the motor oil level. If everything is normal, you can start the diesel engine. After running at a low speed without load for 3-5 minutes, you can begin work.
Down-the-hole hammer drilling is a technique used primarily for drilling boreholes in hard rock applications. It employs a pneumatic hammer, situated directly at the drill bit, to deliver high-impact blows that effectively break up the rock. This method contrasts with traditional rotary drilling, where the drill bit operates at the surface and relies on torque and weight to penetrate the ground.
The roofing industry has witnessed remarkable advancements in technology and materials. Modern roof covering manufacturers are now integrating smart technology into their products. For instance, solar shingles that blend seamlessly with traditional roofing materials are becoming more popular, allowing homeowners to harness solar energy without compromising on aesthetics.
fabricant de couverture de bol

(1) If the horizontal slurry pump causes a blockage of solid hard deposits in the volute, measures can be taken to remove the blockage.
(2) If the shaft is different from the stuffing box axis, it is mainly due to processing errors and incorrect installation. Then pay attention to check whether the installation is correct after installation. If the sealing water ring is badly worn, a new water ring needs to be replaced. If the sealing water pipe is blocked, the sealing water cannot enter the middle of the packing, resulting in rapid wear of the packing, resulting in material leakage, you should dredge the blocked water pipe and keep the sealing water clean.
(3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.
(1) If the horizontal slurry pump causes a blockage of solid hard deposits in the volute, measures can be taken to remove the blockage.
(2) If the shaft is different from the stuffing box axis, it is mainly due to processing errors and incorrect installation. Then pay attention to check whether the installation is correct after installation. If the sealing water ring is badly worn, a new water ring needs to be replaced. If the sealing water pipe is blocked, the sealing water cannot enter the middle of the packing, resulting in rapid wear of the packing, resulting in material leakage, you should dredge the blocked water pipe and keep the sealing water clean.
(3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.
Inspection Before Using the Integrated Drilling and Piling Machine:
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank