traitement thermique de forage
4. Effluent Pumps While these pumps are similar to drainage pumps, they are explicitly designed to handle wastewater and effluent from residential and industrial applications, transferring it to a treatment or disposal area.
1. Flow Rate The flow rate is a critical factor in determining how efficiently the mud pump operates. It is generally expressed in gallons per minute (GPM) or liters per minute (LPM). The flow rate can be calculated using the formula
In the realm of construction, automotive repair, and various industrial applications, the 185 CFM (Cubic Feet per Minute) portable air compressor stands out as an invaluable tool. Its versatility, efficiency, and ease of transport make it an essential piece of equipment for professionals and enthusiasts alike. This article delves into the features, benefits, and applications of the 185 CFM portable air compressor, highlighting why it is a preferred choice for many.
디젤 공기 압축기란?
1. Power and Performance The 185 CFM rating signifies that this compressor can deliver 185 cubic feet of compressed air per minute. This capacity is ideal for powering multiple tools simultaneously, making it a favorite among contractors and industrial workers.
Выбор дизельного воздушного компрессора с производительностью 200% CFM – это разумное решение для многих предприятий, стремящихся повысить свою эффективность и производительность. Такие компрессоры обеспечивают надежность, экономию и высокую эффективность, что делает их незаменимыми в большинстве промышленных и строительных применений. Инвестиции в такое оборудование обеспечат долгосрочные результаты и ускорят рабочие процессы, что в конечном итоге приведет к росту прибыли.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank