Горнодобывающие буровые штанги
4. The average flow rate of the pipeline is too low, and the average flow rate of the pipeline is lower than the critical settlement deceleration, resulting in pipeline blockage and unable to transport slurry normally. Through the above examples, it can be seen that the selection of ZJ series slurry pump is more complicated, and if any link makes a mistake, it may lead to the mistake of the entire selection, causing irreparable losses to users, and having an adverse impact on their reputation. Therefore, in the selection, we must pay attention to the values of several key coefficients and calculate them carefully to achieve accuracy, so that the ZJ series slurry pump can fully reflect its advantages in field application.
4. Power Generation In power plants, particularly coal-fired ones, heavy slurry pumps are utilized to handle ash and other byproducts safely and effectively. These pumps transport the slurry to disposal areas or recycle it, minimizing environmental impact.
- Tricone Bits Comprised of three rotating cones, these bits are effective in various formations, especially in oil and gas drilling.
In the mining sector, jaw crushers are extensively utilized for the primary reduction of various materials. These include limestone, granite, and ore, all of which are naturally tough and abrasive. The effectiveness of jaw plates made from manganese steel directly impacts the efficiency of the crushing process. A well-designed jaw plate can significantly reduce downtime caused by wear and tear, leading to increased productivity and lower operating costs for mining companies.
manganese jaw plate

The main components of submarine hammer drilling equipment include the drill rig, hammer, drill pipes, and the drill bit. The drill rig is often mounted on a surface vessel or a floating platform and is designed to support the excessive weight and dynamic forces encountered during drilling operations.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.