brocadeur de joues de titane
디젤 공기 압축기 (90 CFM)의 이해와 장점
1. 건설 현장 굴착기, 해머 드릴, 페인트 스프레이어 등 다양한 도구들이 필요로 하는 압축 공기를 제공합니다. 특히 대형 건설 프로젝트에서 여러 도구를 동시에 사용할 수 있어 생산성을 크게 향상시킵니다.
4. Reduced Costs Despite potentially higher upfront equipment costs, DTH drilling can lead to substantial savings over time. The efficiency and speed of the method mean lower labor costs and quicker project completion times. Furthermore, the reduced need for extensive maintenance and downtime enhances overall productivity.
2. Rock drill: used to drill holes with a diameter of 20 ~ 100 mm and a depth of less than 20 meters in rocks above medium and hard. According to its different power can be divided into pneumatic, internal combustion, hydraulic and electric rock drill, of which pneumatic rock drill is the most widely used.
Understanding Heavy Slurry Pumps
The hammer itself can be operated using a pneumatic or hydraulic system, with hydraulic hammers being the preferred choice in most cases due to their consistent performance and reliability. The drill bit used is often designed specifically for marine environments, featuring reinforced materials and cutting edges optimized for hard substrates.
3. Fuel Efficiency Diesel engines are known for their fuel efficiency compared to their gasoline counterparts. This results in longer operational times with less frequent refueling, which is particularly advantageous for projects that demand extended hours of work.
The Importance of Rubber-Lined Pumps in Industrial Applications
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank