poubelle.
Drill pipes are essential for transmitting drilling fluids and rotational force from the surface to the drill bit. High-strength steel alloys are commonly used for drill pipes due to their ability to withstand high torque and pressure.
The main components of submarine hammer drilling equipment include the drill rig, hammer, drill pipes, and the drill bit. The drill rig is often mounted on a surface vessel or a floating platform and is designed to support the excessive weight and dynamic forces encountered during drilling operations.
The Rising Demand for Drilling Equipment A Comprehensive Overview
The versatility of portable rotary air compressors allows them to be utilized across a variety of sectors
Innovations in Roof Covering
2. 내구성 디젤 엔진은 구조적으로 강하고 내구성이 뛰어나기 때문에 거친 환경에서도 안정적으로 작동할 수 있습니다. 비 오는 날이나 먼지가 많은 작업 현장에서도 신뢰할 수 있는 성능을 제공합니다.
The reason:The suction pipe is not filled with water
Blocked suction line or inadequate valve opening
The inlet pipe of the pump, the meter or the stuffing box are serious
Blocked suction line or inadequate valve opening
The inlet pipe of the pump, the meter or the stuffing box are serious
5. Location and Distribution Costs
Les barres de forage, ou drill rods en anglais, jouent un rôle crucial dans l'industrie de l'exploration minière et pétrolière. Elles constituent un élément essentiel des équipements de forage, permettant de percer le sol et d'atteindre les profondeurs nécessaires pour explorer les ressources naturelles. Dans cet article, nous examinerons les différents types de barres de forage, leurs matériaux, ainsi que leur importance et leur application dans l'industrie.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank