agujero de perforación.
In construction, the 20mm drill rod plays a crucial role in the installation of foundations, retaining walls, and other structural elements. It is often used in conjunction with augers to excavate soil, providing essential support for various types of construction projects. Additionally, the rod can be deployed in trenching operations, making it a versatile tool for civil engineering applications.
3. 자동차 정비 정비소에서 공기 압축기는 다양한 공구를 구동하는 데 필수적입니다. 타이어 공기 주입기, 에어 인퓨전기, 그리고 공압식 조타기 등 다양한 장비가 압축 공기를 사용합니다.
4. Renewable Energy Projects With the rise of offshore wind energy, submarine hammer drilling is increasingly used to install the foundations for wind turbines. The ability to achieve deep penetration in various seabed conditions makes this method invaluable in the renewable energy sector.
(3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
The 185 cubic feet per minute air compressor stands out as a versatile and efficient tool essential for various industries. Its ability to deliver a consistent flow of compressed air makes it indispensable for numerous applications, from construction to automotive repair and manufacturing. As the industrial landscape evolves and demands for reliable, efficient equipment grow, the market for 185 CFM air compressors is poised to expand further. Investing in such equipment not only enhances productivity but also contributes to improved outcomes across a multitude of tasks. Whether you are a contractor, a manufacturer, or a DIY enthusiast, a 185 CFM air compressor is a worthy addition to your toolkit, ensuring that you are well-equipped to tackle any challenge that comes your way.
A DTH hammer is a type of percussion drilling tool that functions by delivering a series of rapid impacts to the drill bit, which then breaks the rock or other materials beneath the surface. The term down-the-hole refers to the hammer being placed directly above the drill bit, allowing the energy from the hammer to be transferred efficiently into the drill bit. This method enhances the speed and effectiveness of drilling operations, particularly in hard rock formations.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank