3 8 drill rod
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
The frame is the backbone of the jaw crusher. It is typically made of cast steel or welded constructions to ensure it can withstand the immense forces exerted during the crushing process. The robustness of the frame not only provides structural integrity but also helps absorb vibrations, which can be detrimental to the machinery over time.
The Mechanism Behind DTH Drilling
The Slurry Pump Blade Factory Engineering Efficiency and Innovation
The reason:
The suction pipe is not filled with water
Blocked suction line or inadequate valve opening
The inlet pipe of the pump, the meter or the stuffing box are serious
The suction pipe is not filled with water
Blocked suction line or inadequate valve opening
The inlet pipe of the pump, the meter or the stuffing box are serious