diamante de rocha de 6 polegadas
Portability is another significant advantage. Unlike stationary compressors, 185 CFM units often come mounted on trailers, making them easy to transport to various job sites. This mobility is particularly beneficial for contractors who work on multiple projects in different locations.
2. Rock drill: used to drill holes with a diameter of 20 ~ 100 mm and a depth of less than 20 meters in rocks above medium and hard. According to its different power can be divided into pneumatic, internal combustion, hydraulic and electric rock drill, of which pneumatic rock drill is the most widely used.
\text{Pressure} (psi) = \text{Fluid Density} (ppg) \times \text{Depth} (ft) \times 0.433
One of the most striking features of the 185 CFM portable air compressor is its ability to deliver a substantial amount of air pressure. With a rated output of 185 CFM, this compressor can power a wide range of pneumatic tools, including impact wrenches, nail guns, and spray guns. This versatility makes it ideal for various tasks, from construction and woodworking to tire inflation and automotive work. Whether you are operating in a workshop or on a job site, the 185 CFM model can handle the demands of multiple tools simultaneously, increasing productivity and reducing downtime.
1. 효율성 디젤 엔진은 다른 연료에 비해 연료 효율성이 높습니다. 이는 장시간 동안 작업해야 하는 건설 현장에서 특히 중요한 요소입니다. 덕분에 작업자는 연료 비용을 절감할 수 있습니다.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank