prix de l'engin de forage
One of the standout characteristics of the ZJ slurry pump is its ability to handle a wide range of solid concentrations, from light to heavy slurries. This flexibility allows industries to use a single type of pump for multiple applications, simplifying their equipment inventory and reducing maintenance costs.
Conclusion
The main components of submarine hammer drilling equipment include the drill rig, hammer, drill pipes, and the drill bit. The drill rig is often mounted on a surface vessel or a floating platform and is designed to support the excessive weight and dynamic forces encountered during drilling operations.
Чулуу бутлуурын плита
Heavy slurry pumps are designed to transport mixtures of liquid and solid particles, which can be abrasive and corrosive. These pumps are built to withstand challenging conditions, offering durability and reliability. Typically constructed from materials such as high chrome iron or rubber, they are engineered to handle slurries with different densities, viscosities, and particle sizes. The high-capacity pumps can manage large volumes, making them a preferred choice in sectors that require the efficient movement of sediment-laden fluids.
2. Acier allié Pour des applications nécessitant une résistance accrue à la fatigue et à la corrosion, des barres de forage en acier allié peuvent être utilisées. Ces alliages contiennent des éléments tels que le nickel, le chrome et le molybdène, qui augmentent leur résistance et leur longévité.
drill rod stock

(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank