equipo de perforación terrestre
The main components of submarine hammer drilling equipment include the drill rig, hammer, drill pipes, and the drill bit. The drill rig is often mounted on a surface vessel or a floating platform and is designed to support the excessive weight and dynamic forces encountered during drilling operations.
Regular replacement of wear-prone parts like drill bits and filters is an indispensable part of maintenance work. Establishing a reasonable replacement schedule based on usage frequency and working conditions can effectively prevent failures, ensuring the continuity and efficiency of operations.
\text{Pressure} (psi) = \text{Fluid Density} (ppg) \times \text{Depth} (ft) \times 0.433
(3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.
The horizontal slurry pump should be used for regular maintenance. This can effectively avoid the problem of slurry pump blockage, and if you encounter these problems in the process of using slurry pump in the later stage, you can solve them according to the above steps.
(3) If the impeller or the inlet and outlet water pipe is blocked, the impeller or pipe can be cleaned, and if the impeller is seriously worn, it should be replaced. If the filler mouth leaks, press the filler. If the conveying height is too high or the tube loss resistance is too large, the conveying height should be reduced or the resistance reduced.
The horizontal slurry pump should be used for regular maintenance. This can effectively avoid the problem of slurry pump blockage, and if you encounter these problems in the process of using slurry pump in the later stage, you can solve them according to the above steps.