brocadeur de joues de titane
Several features make 185 CFM air compressors appealing to industries and individuals alike. Their robust construction ensures longevity and durability, capable of performing under challenging conditions. Moreover, many models are designed with user-friendly controls and safety mechanisms, allowing even novice users to operate them with ease.
じて、le dhd380はそのいといやすさ、から、々なでのニーズにえることができるです。ものとともに、さらなるをめていることでしょう。これにより、たちのやビジネスはでなものへとわっていくのです。
A Commitment to Innovation
1. Greater Efficiency DTH drilling significantly reduces drilling time when compared to rotary methods. The direct impact of the hammer allows for faster penetration rates, enabling operators to cover more ground in shorter periods. This efficiency is especially critical in industries where time equates to money.
2. Marine Construction When constructing offshore platforms, bridges, or wind farms, the stability of foundations is paramount. Hammer drilling provides a reliable method to secure pilings and conduct deep foundation work, ensuring that structures can withstand harsh marine conditions.
Equipment and Technology
2. Advanced Technology Many Chinese manufacturers invest heavily in research and development, leading to innovations in pump design and performance. This results in more efficient pumps that can handle larger volumes or more challenging materials than their predecessors.
Understanding 185% Compressors The Key to Efficient Performance
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank