high head slurry pump
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
In summary, the calculation of a mud pump’s performance—including flow rate, pressure, and horsepower—is an essential aspect of drilling operations. Understanding these metrics not only helps in selecting the right pump for the job but also ensures that drilling activities can proceed smoothly and safely. Ignoring these calculations can lead to operational inefficiencies, increased costs, and risks to the safety of the crew. Therefore, professionals in the field must prioritize accurate calculations and remain vigilant about the conditions and performance of their mud pumps to facilitate successful drilling projects.
Slurry pump will be found in the use of the process of blockage, so how do we deal with this problem, many customers think that this is a more complex problem, but if the blockage problem is not handled well, it will cause damage to the equipment, which will also affect the efficiency of use.
Нэмж хэлэхэд, чулуу бутлуурын плита нь засвар үйлчилгээ, солилцооны явцад ихээхэн ач холбогдолтой. Түүний эд анги, гадаад хэлбэр, зураас, элэгдэл зэргээс шалтгаалаад заслын үйл явц ихээхэн урт хугацаа шаарддаг. Иймд, плитаа тогтмол хянах, шаардлагатай үед засвар үйлчилгээ хийх, материалыг шалгах нь чухал юм.
Hammer vs Bajo el Pozo A Clash of Symbolism and Theme
Cleaning method:
Fill the pump with water
Open the inlet door and clean the clogged part of the pipeline
Plug the leak area and check whether the packing is wet or compressed
Fill the pump with water
Open the inlet door and clean the clogged part of the pipeline
Plug the leak area and check whether the packing is wet or compressed