briser le coude
The DTH hammer operates through a system of compressed air. High-pressure air is directed down the drill string, powering the hammer at the end of the drill bit. The hammer strikes the bit with considerable force, fracturing the rock immediately beneath it. As the bit penetrates further, the broken rock is then cleared from the hole by the same air stream, allowing for continuous drilling without the interruptions often associated with other drilling methods.
Submarine hammer drilling sees extensive applications in several sectors
2. Increased Accuracy The DTH method offers superior hole quality, producing straighter boreholes with less deviation. This precision is vital for applications that require exact placement of blast holes or geothermal probes.
Slurry pump in the use of the process will find blockage, so how should we deal with this problem, many customers think that this is a more complex problem, but if the blockage problem is not handled well, it will cause damage to the equipment, which will also affect the efficiency of use, then slurry pump blockage problem we should pay special attention to it. So how to deal with the slurry pump blockage problem? The following part explains the treatment method of slurry pump blockage.
In addition to oil and gas and mining, sectors such as construction and geothermal energy are also contributing to the surge in demand for drilling equipment. The construction industry requires drilling equipment for foundation work, site preparation, and tunneling projects, while the geothermal sector relies on specialized drilling rigs to tap into the Earth's heat. This diversification illustrates the versatility of drilling equipment and highlights its importance across multiple industries.
1. Depth and Efficiency One of the most significant advantages of DTH rigs is their ability to drill to greater depths compared to conventional rotary drilling methods. They are capable of drilling depths exceeding 100 meters with great precision, which is essential in mining operations for reaching ore deposits.
The Manufacturing Process
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank