venda de máquinas de perfuração
- Geothermal Energy The ability to create deep, straight boreholes makes DTH drilling an excellent choice for geothermal energy projects, allowing reliable access to thermal resources.
3. 자동차 정비 정비소에서 공기 압축기는 다양한 공구를 구동하는 데 필수적입니다. 타이어 공기 주입기, 에어 인퓨전기, 그리고 공압식 조타기 등 다양한 장비가 압축 공기를 사용합니다.
Hammer vs Bajo el Pozo A Clash of Symbolism and Theme
Down-the-hole hammer drilling is a technique used primarily for drilling boreholes in hard rock applications. It employs a pneumatic hammer, situated directly at the drill bit, to deliver high-impact blows that effectively break up the rock. This method contrasts with traditional rotary drilling, where the drill bit operates at the surface and relies on torque and weight to penetrate the ground.
To ensure the effective operation of a sump pump designed for mud evacuation, regular maintenance is crucial. This includes routine inspections, cleaning out the sump basin, checking the float switch, and ensuring that the discharge line is clear of obstructions. Neglecting these maintenance tasks can lead to pump failure, potentially resulting in severe flooding or mud accumulation.
3. Large Fuel Tank With a sizeable fuel reservoir, the CFM 185 can run for extended periods without the need for frequent refueling. This feature is crucial for large projects that require sustained air pressure and productivity.
2. Rock drill: used to drill holes with a diameter of 20 ~ 100 mm and a depth of less than 20 meters in rocks above medium and hard. According to its different power can be divided into pneumatic, internal combustion, hydraulic and electric rock drill, of which pneumatic rock drill is the most widely used.
Заключение
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank