10 мм буровые штылки
In order to accurately align the pile position, the crawler pile frame can be allowed to walk and move the pile position and rotate the mechanism. When the position of the rotating pile frame is not accurate, you can continue to walk back and forth or rotate to ensure accuracy.
Unique Weather Patterns
The top of the crawler piling rig column should be connected with a lightning rod according to the regulations, and the work should be stopped in case of thunderstorm during operation to protect personal and property safety.
The DTH hammer operates through a system of compressed air. High-pressure air is directed down the drill string, powering the hammer at the end of the drill bit. The hammer strikes the bit with considerable force, fracturing the rock immediately beneath it. As the bit penetrates further, the broken rock is then cleared from the hole by the same air stream, allowing for continuous drilling without the interruptions often associated with other drilling methods.
Cleaning method:
Fill the pump with water
Open the inlet door and clean the clogged part of the pipeline
Plug the leak area and check whether the packing is wet or compressed
Fill the pump with water
Open the inlet door and clean the clogged part of the pipeline
Plug the leak area and check whether the packing is wet or compressed