pompe à boue métallique
Portability and Ease of Use
Manufacturers of self-priming slurry pump solutions offer customized solutions tailored to the specific needs of industries. Whether it's high-flow applications, corrosive environments, or heavy-duty operations, these pumps can be customized to meet the unique requirements of each industry.
Manufacturers of self-priming slurry pump solutions offer customized solutions tailored to the specific needs of industries. Whether it's high-flow applications, corrosive environments, or heavy-duty operations, these pumps can be customized to meet the unique requirements of each industry.
Heavy slurry pumps are designed to transport mixtures of liquid and solid particles, which can be abrasive and corrosive. These pumps are built to withstand challenging conditions, offering durability and reliability. Typically constructed from materials such as high chrome iron or rubber, they are engineered to handle slurries with different densities, viscosities, and particle sizes. The high-capacity pumps can manage large volumes, making them a preferred choice in sectors that require the efficient movement of sediment-laden fluids.
04 REPLACE WEAR PARTS
Slurry pumping is an essential process in various industrial sectors including mining, construction, and wastewater treatment. A slurry is a mixture of solid particles and liquid, which can vary widely in properties, making the choice of pump critical for efficiency and effectiveness. In this article, we will explore the types of pumps used for slurry applications, their working principles, and the factors to consider when selecting the right pump.
Conclusion
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank